This story is from March 13, 2025
Parliamentary panel flags poor fund use for water projects, seeks better utilisation
NEW DELHI: Voicing concern over poor utilisation of funds, a parliamentary panel has said the department of water resource, river development and Ganga rejuvenation, utilised only around 58 per cent of the revised allocation of Rs 21,640.88 crore for 2024-25 by the end of December 2024. The panel urged the Jal Shakti ministry to strengthen monitoring and implementation mechanisms.
In its report tabled in Parliament, the Standing Committee on Water Resources said nearly 40 per cent of the allocated funds remained unspent and highlighted delays in fund disbursal and project execution.
The ministry has attributed the low spending to the fact that expenditure typically picks up after the monsoon season and assured the panel that pending proposals worth Rs 3,000 crore were under active consideration.
The report highlighted significant increases in budgetary allocations for key schemes under the Jal Shakti ministry.
The total budget for the department has been raised to Rs 25,276.83 crore for 2025-26, an 18.54 per cent increase from the Rs 21,323.10 crore allocated in the previous year. The rise is driven largely by higher allocations for groundwater management, river basin development, and the Polavaram Irrigation Project.
The allocation for groundwater management and regulation has increased by 56.61 per cent to Rs 509 crore in 2025-26, reflecting the government's push to strengthen groundwater mapping and management under the National Aquifer Mapping and Management Programme (NAQUIM).
The River Basin Management programme has also received a 56.98 per cent increase, with Rs 243 crore allocated for 2025-26. The Brahmaputra Board, which manages flood control and erosion in the northeast, is expected to take up new initiatives, including preparing master plans for 15 sub-basins.
However, some schemes have faced budget cuts. The National Hydrology Project (NHP) saw a 98 per cent reduction, from Rs 661.20 crore in 2024-25 to Rs 13 crore in 2025-26, as it is set to conclude in September 2025.
Similarly, the allocation for the Command Area Development and Water Management (CADWM) scheme has been reduced by 39.28 per cent to Rs 850 crore, following lower-than-expected expenditure in the previous year due to delayed approval of a sub-scheme.
The Atal Bhujal Yojana (Atal Jal), focused on groundwater management, has been allocated Rs 1,780.40 crore for 2025-26, which marks a slight increase from Rs 1,778 crore in 2024-25. However, the scheme did face operational challenges last year due to the transition to a new fund flow model, which delayed fund disbursement.
The ministry has assured the panel that the transition would be completed soon to ensure smoother implementation.
The report also examined the status of the Polavaram Irrigation Project in Andhra Pradesh, which received an allocation of Rs 5,936 crore for 2025-26, up from Rs 5,512.50 crore in the previous year.
The project, declared a national project under the Andhra Pradesh Reorganisation Act, 2014, is expected to be completed by March 2026, with provisions for a one-year extension.
The panel noted that Rs 30,436.95 crore had been approved for the project's first phase, which aims to store water at over 41.15 metres elevation.
Concerns were also raised by the panel over the Brahmaputra Board's capacity to implement flood control and drainage projects.
Out of 415 sanctioned positions, 209 remain vacant, including key technical posts. The panel stressed the need for immediate recruitment to fill these gaps and ensure effective project execution.
The committee also called for greater focus on rainwater harvesting, noting that while the Jal Shakti Abhiyan: Catch the Rain campaign has made progress, no direct financial support has been provided to states for rainwater harvesting.
The panel recommended increased funding and direct incentives to states and local bodies to accelerate the construction and repair of rainwater harvesting structures.
The report flagged ongoing issues with river interlinking projects, including the stalled implementation of the Ken-Betwa Link Project and other major inter-state water transfer schemes.
The panel urged the ministry to resolve inter-state disputes and fast-track approvals for these critical projects.
The committee called for improved oversight of state-level execution and urged the ministry to address delays in fund release and project completion.It also recommended a reassessment of resource allocation to ensure efficient utilisation and timely project implementation.
Follow the latest election results 2026, live updates, winner lists, constituency-wise results, party-wise trends and full coverage for Tamil Nadu election results, West Bengal election results, Kerala election results, Assam election results and Puducherry election results results on Times of India.
Election Results 2026
The ministry has attributed the low spending to the fact that expenditure typically picks up after the monsoon season and assured the panel that pending proposals worth Rs 3,000 crore were under active consideration.
The report highlighted significant increases in budgetary allocations for key schemes under the Jal Shakti ministry.
The total budget for the department has been raised to Rs 25,276.83 crore for 2025-26, an 18.54 per cent increase from the Rs 21,323.10 crore allocated in the previous year. The rise is driven largely by higher allocations for groundwater management, river basin development, and the Polavaram Irrigation Project.
The allocation for groundwater management and regulation has increased by 56.61 per cent to Rs 509 crore in 2025-26, reflecting the government's push to strengthen groundwater mapping and management under the National Aquifer Mapping and Management Programme (NAQUIM).
The River Basin Management programme has also received a 56.98 per cent increase, with Rs 243 crore allocated for 2025-26. The Brahmaputra Board, which manages flood control and erosion in the northeast, is expected to take up new initiatives, including preparing master plans for 15 sub-basins.
Similarly, the allocation for the Command Area Development and Water Management (CADWM) scheme has been reduced by 39.28 per cent to Rs 850 crore, following lower-than-expected expenditure in the previous year due to delayed approval of a sub-scheme.
The Atal Bhujal Yojana (Atal Jal), focused on groundwater management, has been allocated Rs 1,780.40 crore for 2025-26, which marks a slight increase from Rs 1,778 crore in 2024-25. However, the scheme did face operational challenges last year due to the transition to a new fund flow model, which delayed fund disbursement.
The ministry has assured the panel that the transition would be completed soon to ensure smoother implementation.
The report also examined the status of the Polavaram Irrigation Project in Andhra Pradesh, which received an allocation of Rs 5,936 crore for 2025-26, up from Rs 5,512.50 crore in the previous year.
The project, declared a national project under the Andhra Pradesh Reorganisation Act, 2014, is expected to be completed by March 2026, with provisions for a one-year extension.
The panel noted that Rs 30,436.95 crore had been approved for the project's first phase, which aims to store water at over 41.15 metres elevation.
Concerns were also raised by the panel over the Brahmaputra Board's capacity to implement flood control and drainage projects.
Out of 415 sanctioned positions, 209 remain vacant, including key technical posts. The panel stressed the need for immediate recruitment to fill these gaps and ensure effective project execution.
The committee also called for greater focus on rainwater harvesting, noting that while the Jal Shakti Abhiyan: Catch the Rain campaign has made progress, no direct financial support has been provided to states for rainwater harvesting.
The panel recommended increased funding and direct incentives to states and local bodies to accelerate the construction and repair of rainwater harvesting structures.
The report flagged ongoing issues with river interlinking projects, including the stalled implementation of the Ken-Betwa Link Project and other major inter-state water transfer schemes.
The panel urged the ministry to resolve inter-state disputes and fast-track approvals for these critical projects.
The committee called for improved oversight of state-level execution and urged the ministry to address delays in fund release and project completion.It also recommended a reassessment of resource allocation to ensure efficient utilisation and timely project implementation.
Follow the latest election results 2026, live updates, winner lists, constituency-wise results, party-wise trends and full coverage for Tamil Nadu election results, West Bengal election results, Kerala election results, Assam election results and Puducherry election results results on Times of India.
Popular from India
- Tamil Nadu election result 2026: Date, time and where to follow live counting of votes - full schedule
- West Bengal election result 2026: Date, time and where to follow live counting of votes - full schedule
- India dismisses Nepal’s Kailash yatra objection over Lipulekh Pass
- SG Tushar Mehta takes swipe at ‘bully’ judges in his book
- Assembly election result 2026: Date and time of result for Assam, Kerala, Tamil Nadu, West Bengal, Puducherry, exit poll predictions, where, how to watch and other details
end of article
Trending Stories
- Election Results 2026 Live Updates: Bengal, Tamil Nadu, Assam, Kerala, Puducherry brace for voters' verdict
- NEET UG 2026: Safe score, expected cut-off and marks needed for MBBS admission to government and private colleges
- Assembly election result 2026: Date and time of result for Assam, Kerala, Tamil Nadu, West Bengal, Puducherry, exit poll predictions, where and how to watch and other details
- US-Israel-Iran War News Live Updates: Iranian super tanker slips past US blockade with $220 million oil cargo
- CBSE Class 12th Result Live Updates: When will class 12 scorecards be released? Check latest updates, steps to download from DigiLocker and UMANG app here
- Luka Doncic injury update: Brian Windhorst drops latest news on Lakers star
- Maharashtra HSC Result 2026 Live Updates: Expected next week after Buddha Purnima and weekend gap, DigiLocker shows coming soon status
Featured in India
- Congress: Government ignored Nicobar concerns
- Heart donated in Panchkula gives Sudanese teen in Delhi new life
- Abandoned in forest, 2-year-old walks for 20 hours, survives
- Team Raghav Chadha to get audience with President Murmu ahead of Bhagwant Mann
- Canadian intelligence agency accuses India of interference, spying
- India dismisses Nepal’s Kailash yatra objection over Lipulekh Pass
Photostories
- Morning affirmation at 5 am: Thoughts that hit different when the world is still asleep
- You’re brushing your teeth wrong: What dentist says most people miss
- How to make Pudina Paratha for summer breakfast
- 5 Bengali breads every foodie should try
- 5 phases every marriage quietly moves through- And how to deal with them
- 5 rare watches from Sachin Tendulkar’s collection you should know
- You’re walking, but not like this: How interval walking improves fitness naturally
- Subtle signs you might be vitamin D deficient, and what your body is trying to tell you
- Red vs green Apple: How to choose the right one for your health goals
- Rihanna to Katy Perry: 7 most bizarre Met Gala looks that stole the spotlight
Videos
03:40 Nepal Objects To India-China Plan To Conduct Kailash Mansarovar Yatra Via Lipulekh03:25 India-Linked LPG Tanker MT Sarv Shakti Heads To Visakhapatnam After Crossing Hormuz03:01 Passenger Opens Emergency Exit Door On Air Arabia Flight While Taxiing At Chennai Airport, Arrested- Ahead Of Counting, Gunmen Open Fire At BJP Leader’s House In Bengal’s Noapara
- ‘I Am Also A Victim’: Vinesh Phogat Identifies As Complainant In Brij Bhushan Sexual Harassment Case
03:01 BJP MP Sandeep Pathak Claims ‘No Information’ On FIRs, Alleges Misuse Of State Machinery In Punjab04:30 Indian Startup Launches Mission Drishti, World’s First OptoSAR Satellite, Aboard SpaceX Falcon 904:15 Diljit Dosanjh Confronts Khalistan Supporters at Calgary Concert, Explains KBC Appearance03:21 Delhi Approves ₹48,000 Crore Metro Expansion Plan To Connect Outer Regions With City Core
Up Next
Start a Conversation
Post comment