Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Election Results 2026
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

India’s largest rail TBMs deployed for Mumbai-Ahmedabad bullet train underground section: What we know

TOI City Desk
| TIMESOFINDIA.COM | Last updated on - May 18, 2026, 16:06 IST
Comments
Share
1/7

Key Milestone: Cutterhead Lowered at Vikhroli

Marking a major milestone in the Mumbai-Ahmedabad bullet train project, a 350-tonne tunnel boring machine cutterhead was lowered at Vikhroli, beginning assembly of the underground tunnelling system phase development work.

2/7

Massive Cutterhead Dimensions and Assembly

The cutterhead weighs 350 tonnes and measures 13.6 metres in diameter, forming the front end of the TBM, delivered in five consignments and assembled using precision welding techniques onsite work.

3/7

Large-Scale Mumbai Tunnel Construction

Mumbai tunnel spans 21 km, with 16 km constructed using two massive TBMs, each weighing over 3,000 tonnes, designed to build a single tunnel carrying both up and down lines.

4/7

Undersea Tunnel Beneath Thane Creek

The project includes a 7 km stretch beneath Thane Creek, marking India’s first undersea rail tunnel, forming part of the high-speed corridor’s most complex underground section development engineering major challenge.

5/7

Largest TBMs in India’s Rail History

TBMs are the largest ever deployed in India for rail tunnel construction, setting a new benchmark in scale, capacity, and engineering capability for underground infrastructure development projects sector.

6/7

. Advanced Cutterhead Engineering Design

The cutterhead features 84 cutter discs, 124 scrapers, and 16 bucket lips, designed to break rock and soil, clear excavated muck efficiently, and guide material into the chamber pipeline system.

7/7

Excavation Route from Vikhroli to BKC

From Vikhroli, the TBM will excavate nearly 6 km towards Bandra-Kurla Complex, passing beneath dense urban areas and the Mithi River before being retrieved at the under-construction station complex site.

Top Comment
T
Trouble Shooter
23 hours ago
thank the private sector for getting this technology and bearing all the risks of geological uncertainty while the political masters enjoy taking all the credit. the government only borrows money and acts as conduit to make payments
Read allPost comment
Photostories
  • Bengaluru ORR tech corridor set for Rs 378-crore concretisation, year-long traffic chaos likely
  • Why desert snakes move sideways and leave mysterious tracks in the sand
  • Steve Jobs quotes that completely changed how people think about work and life
  • Michael Jackson's acting roles: All about films in which the King of Pop starred
  • Mouni Roy channels ultimate revenge dressing in bold monochrome settings at Cannes 2026, post-split separation buzz with Suraj Nambiar
  • How to prevent dust from entering home through windows
  • 7 snakes with colours so bright they look AI-generated
  • 10 parenting advice given to young parents that can be happily ignored
  • Happy Birthday Ruskin Bond: 5 timeless books everyone should read
  • 9 seasonal fruits one should eat in the month of May
Explore more Stories
  • 7
    Bengaluru ORR tech corridor set for Rs 378-crore concretisation, year-long traffic chaos likely
  • 7
    India achieves milestone as first domestically produced C-295 aircraft is ready for flight test
  • 7
    Bengaluru Airport Breaks Records With 2.8 Lakh Flight Movements in One Year
  • 8
    Inside Chennai Port–Maduravoyal elevated corridor: 21-km mega expressway takes shape
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • India’s largest rail TBMs deployed for Mumbai-Ahmedabad bullet train underground section: What we know
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 19, 2026, 04.23PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service