Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Second Steel Bridge Erected in Ahmedabad for Mumbai-Ahmedabad Bullet Train Project

Yogesh Chawda
| TNN | Last updated on - Nov 25, 2025, 14:50 IST
Comments
Share
1/10

Second Steel Bridge Constructed in Ahmedabad

The second steel bridge for the Mumbai-Ahmedabad bullet train project has been successfully erected in Ahmedabad over the Cadila bridge, marking a key milestone in the high-speed rail corridor. The bridge ensures uninterrupted progress of the corridor’s infrastructure development.

2/10

Bridge Specifications – Length and Weight

The newly constructed bridge spans 70 metres and weighs 670 metric tonnes. Fabricated in Navsari, the massive steel structure was transported to Ahmedabad using specialised heavy-duty trailers, showcasing the scale and precision involved in bullet train infrastructure projects.

3/10

Strategic Location Over Cadila Bridge

Erected over the Cadila bridge in Ahmedabad, this steel structure is critical for the bullet train corridor. Its location ensures seamless integration with existing rail infrastructure and supports the planned high-speed rail alignment across urban and industrial zones.

4/10

Assembly Process and Elevation

The bridge was assembled adjacent to the railway tracks and elevated 16.5 metres above ground. This method ensured safety, precision, and minimal disruption to ongoing transport activities while maintaining alignment with the corridor’s engineering standards.

5/10

Part of 28 Bridges Along the Corridor

The bridge is one of 28 steel bridges planned along the Mumbai-Ahmedabad bullet train corridor. Gujarat will have 17 bridges, while Maharashtra will have 11, ensuring smooth high-speed rail operations and connectivity across the states.

6/10

Fabrication and Transportation

Fabricated in Navsari, the bridge’s components were carefully transported to Ahmedabad using specialised trailers. The operation demonstrates advanced logistical planning and engineering expertise, highlighting India’s capacity to handle large-scale high-speed rail infrastructure.

7/10

Milestone for Bullet Train Project

The erection of the second steel bridge is a major milestone, signalling steady progress in the Mumbai-Ahmedabad bullet train project. It reflects the project’s adherence to timelines and readiness to meet India’s first high-speed rail operational standards.

8/10

Enhancing Corridor Safety and Efficiency

The bridge has been designed and constructed to meet stringent safety and engineering standards. It will support high-speed rail traffic, reduce potential bottlenecks, and enhance the overall operational efficiency of the corridor.

9/10

Boosting Gujarat’s Infrastructure Capabilities

The bridge construction demonstrates Gujarat’s growing infrastructure capabilities. From fabrication to transport and assembly, the project has created employment, boosted local expertise, and set benchmarks for large-scale steel bridge construction in India.

10/10

Upcoming Bullet Train Milestones

With the second steel bridge completed, focus shifts to subsequent bridge erections and station-area development. These milestones are key to ensuring timely commissioning of the Mumbai-Ahmedabad high-speed rail corridor and delivering a world-class bullet train experience.

Start a Conversation

Post comment
Photostories
  • Thought of the day inspired by the Bhagavad Gita: “The soul grows quieter when gratitude grows louder”
  • 10 unique baby boy names that begin with the letter S
  • Morning affirmation at 5 am: The sunrise ritual people swear by for a calmer day
  • 10 traditional Indian foods that PM Modi gifted world leaders during his 5-nation tour
  • Aishwarya Rai silences Cannes absence rumours in a head-to-toe black airport look, fans call it her comeback era
  • From chubby little Gangubai to a fit and fab young actress after losing 22 Kgs; Saloni Daini’s stunning transformation is inspiring
  • Plants that thrive during Indian monsoon without rotting
  • Deepika Padukone’s Cannes looks through the years
  • They remember faces and may be smarter than your dog: 8 facts about pigs that sound fake but aren’t
  • 'Agent Kim Reactivated’, 'Doctor on the Edge’: 5 new K-dramas to add to your must-watch list this June
Explore more Stories
  • 8
    Big boost for commuters: 1st girder installed on Mumbai freeway’s Chedda–Anand Nagar stretch; what we know
  • 10
    Mumbai demolition drive: What we know so far
  • 10
    Traffic bottleneck relief in sight as Kalyan station flyover completes crucial milestone: All you need to know
  • 10
    South Delhi to Jewar airport in just 45 minutes? This mega expressway link is almost ready
  • 10
    Twisha Sharma death: From dating app romance to murder allegations and missing husband — what we know
Up Next
  • News
  • /
  • City
  • /
  • Ahmedabad
  • /
  • Second Steel Bridge Erected in Ahmedabad for Mumbai-Ahmedabad Bullet Train Project
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 22, 2026, 08.56AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service