Lack of change results in 3-km long traffic jam at Vashi toll plaza
/ Dec 03, 2016, 18.23 PM IST
Lack of change at Mumbai to Vashi toll plaza resulted in 3 kilometer long traffic jam. Post demonetisation, the toll collection resuming from December 2 midnight.
Also Watched
TOI ORIGINALS
LIVE TV
VIRAL