Kashmir-Ladakh Zojila Pass that is an important connector between the Kashmir Valley and Ladakh has now been opened by the Border Roads Organisation (BRO). The pass is located at a height of 11650 ft, and is an important road in these high regions of the country.
Each year the pass closes around November when the temperature drops by a great degree, and then reopens at the end of April the following year.
The Zojila Pass remains closed for about 150 days every year, but this time it was a little different. The Pass remained open for a longer period of time in 2020, and has also opened up before the scheduled date in 2021. The pass was closed for a total of 110 days this time. Already 10 civilian trucks crossed the pass and went towards Kargil, carrying essential supplies.
The tunnel will reportedly have some exclusive features that make it a modern day smart-tunnel. Apart from CCTV monitoring, the tunnel will also have emergency lighting, ventilation system, and a tunnel radio system. There will also be emergency telephones, and fire fighting cabinets.