Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Tunnels, machines, and milestones: Mumbai gears up as TBM launches for 9.2km underground link

SL Shanth Kumar
| TNN | Last updated on - Dec 3, 2025, 14:39 IST
Comments
Share
1/10

Tunnelling kick-off

The mmrda is preparing to begin tunnelling work for the new east–west underground corridor in south mumbai. The first tunnel boring machine will start operations at orange gate. The launch marks a major milestone for the project. Senior state leaders will attend the ceremony. The event will formally initiate excavation. Work will gradually progress toward marine drive.

2/10

Major engineering milestone

Launching the tbm marks the transition from planning to major physical construction. The machine will carve through complex geological layers beneath the city. Engineers have conducted detailed soil studies to prepare. The operation requires precision and monitoring. This stage is considered one of the toughest. Successful tunnelling is crucial for project timelines.


3/10

CM Fadnavis launches tunnelling work today

Maharashtra chief minister Devendra Fadnavis on Tuesday marked the launch of a tunnel boring machine (TBM) for Mumbai’s planned 9.2km east–west underground tunnel. The event at Orange Gate signals the beginning of excavation work for the ambitious project, which aims to improve connectivity between the eastern waterfront and Marine Drive.

4/10

Key project alignment

The tunnel will link orange gate on the eastern side to marine drive on the western coast. This connection is expected to significantly reduce cross-city travel time. The corridor provides an alternative to congested surface roads. Its design includes deep underground passages. The alignment has been selected to minimise surface disruptions. It will improve east–west connectivity in a high-density zone.


5/10

Urban mobility impact

The tunnel is expected to ease east–west bottlenecks drastically. Commuters often face significant delays between these two zones. The underground route will ensure smooth, uninterrupted movement. It will reduce vehicular load on key arterial roads. The project forms part of a broader mobility overhaul. It will complement upcoming metro and coastal infrastructure.

6/10

Logistics and material handling

The tunnelling process will generate large quantities of excavated earth. Dedicated transport routes are set for debris removal. Storage spaces near the site have been secured. Equipment supply chains have been readied for continuous operations. The mmrda aims to avoid downtime due to logistics. The tunnelling schedule depends on smooth material flow.

7/10

Safety and monitoring

Advanced sensors will track ground stability during excavation. Control rooms will monitor the tbm’s movement in real time. Engineers will evaluate pressure, vibration, and machine speed. Safety zones have been created around the launch area. Workers are being trained for emergency situations. Regular audits will ensure adherence to safety protocols.


8/10

Environmental considerations

Construction teams have planned measures to limit dust and noise. Tunnel boring reduces surface-level disruption. The underground method helps protect heritage precincts. Authorities are monitoring environmental compliance closely. Waste material will be transported in controlled batches. The design also includes safety systems for long-term operation.

9/10

MMRDA’s execution strategy

The agency has mobilised teams for excavation, logistics, and safety coordination. Multiple contractors are involved in the implementation. The project requires synchronised operations at both ends. Authorities are coordinating with civic and utility bodies. A detailed schedule will guide each tunnelling phase. The mmrda is aiming for steady progress once the machine enters full operation.

10/10

Timeline and expectations

Officials expect the tunnelling process to progress steadily over the coming months. Completion depends on technical challenges underground. The tunnel will be a key link in mumbai’s evolving transport network. Authorities are optimistic about on-time delivery. The project is anticipated to reshape regional connectivity. It reflects long-term planning for urban mobility demands.

Start a Conversation

Post comment
Photostories
  • 10 best places to visit in India this June for cool weather, monsoon views and mountain escapes
  • "If we don't waste food, we can..." Why PM Modi has been calling on nation to fight food wastage, 3 key tips to do it at home
  • 10 most colourful cities in the world; best time to visit and essential traveller tips
  • 8 smart ways to make bitter gourd (karela) less bitter
  • 5 personality traits that make Priyanka Chopra Jonas a global icon
  • Protein deficiency: 8 red flags you should never ignore
  • Best Peacock series to add to your watch list right now, from thrillers to mystery dramas
  • A pinch too much: The silent weight of salt on a beating heart
  • 7 animals you didn't know are amphibians
  • 8 pink-coloured attractions around the world every traveller should visit once
Explore more Stories
  • 7
    Rs 20,000 crore, 16 stations: What’s in pipeline for Karnataka’s 1st inter-district metro
  • 10
    Bengaluru set to get India’s 2nd-largest cricket stadium: All you need to know
  • 10
    Another fuel shock? Petrol, diesel and CNG prices climb again
  • 10
    Inside Bengaluru’s Whitefield–Cantonment rail project nears completion
  • 8
    Big boost for commuters: 1st girder installed on Mumbai freeway’s Chedda–Anand Nagar stretch; what we know
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Tunnels, machines, and milestones: Mumbai gears up as TBM launches for 9.2km underground link
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 25, 2026, 03.26PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service