Continue Reading on TOI App
Open
OPEN APP

Passengers suffer as Charbagh railway station undergoes revamp

LUCKNOW: The ongoing renovation work at

Charbagh railway station

appears to be giving a tough time to passengers. While the platforms are damaged leaving little space for people to walk, even the public address system is dysfunctional, which adds to the chaos.


In a reality check by TOI on Thursday, passengers shared their plight. A 70-year-old Rupendra Kumar, who had to board a train to Varanasi said, “I had a narrow escape near the parcel section. I could not balance myself ahead of a huge mountain of debris.”


Rishi, resident of Aliganj sector-5, whose mother was travelling to Dehradun, said, “The platform was changed at the last minute, but we didn’t get to know as the public address system was not working.”


Similarly,

Yogesh Yadav

could not even use the toilet as its entrance was blocked. “When I lodged a complaint with the station master, he asked me to take my father to platform one. The management was ridiculous.”


The extent of the problem can be gauged from the fact that at least 250 trains pass through various

platforms at Charbagh

everyday, while the passenger load exceeds 1.25 lakh.


When asked, divisional railway manager (DRM) Satish Kumar said, “The renovation work is for passenger convenience. But we shall try to sort out the complaints.”

The renovation work includes the foundation work of 6 meter wide foot

overbridge at platform

one, expansion of platforms 2 and 3 and construction of route relay interlocking system (RRIS) building near platform 1.

Start a Conversation

Post comment
Continue Reading
Follow Us On Social Media
end of article
More Trending Stories
Visual Stories
More Visual Stories
UP NEXT
Do Not Sell Or Share My Personal Information