PM to lay foundation for 22,864-cr high-speed corridor in March: Himanta
Guwahati: Prime Minister Narendra Modi will lay the foundation stone for the Silchar-Shillong-Guwahati high-speed corridor project in March, which will be a game-changing road, reducing travel time from Silchar to Guwahati by around 5 hours, chief minister Himanta Biswa Sarma said on Sunday. Besides this, the PM will also lay the foundation of Kamakhya ropeway project.
“This will be a game-changing road, reducing travel time from Silchar to Guwahati to 4.5-5 hours. It is the biggest project being implemented by the Union govt in Assam, with a total cost of Rs 22,864 crore,” Sarma said while addressing the media on Sunday here.
PM Modi is scheduled to visit Assam in March ahead of the assembly polls, which will be his fourth visit to the poll-bound state since Dec.
The high-speed corridor was announced by the Union cabinet in April last year. The project spans a length of 166.80km, with 144.80km in Meghalaya and 22km in Assam.
The proposed greenfield high-speed corridor will improve connectivity to Tripura, Mizoram, Manipur and the Barak Valley of Assam from the mainland and Guwahati, with reduced travel distances and time.
The CM said, “The PM will also lay the foundation for the Kamakhya ropeway project, which will connect the Kamakhya railway station with the temple.” He added that the govt has already floated the tender for the ropeway project and the process will be completed soon.
The Gauhati high court on Thursday allowed the state govt to proceed with the Maa Kamakhya Temple Access Corridor project to facelift the temple premises, after the state govt assured the court that “execution of the project would be as per the drawings and designs approved by IIT Guwahati and the project would be executed without affecting the temples in any manner whatsoever.”
“After some people opposed the corridor, the Gauhati high court asked IIT Guwahati and the National Institute of Hydrology to study if the project would have any ecological impact. They said there would be no impact,” the CM said. Sarma said the work for the stalled Maa Kamakhya Temple Access Corridor project under the PM-DevINE scheme is likely to resume soon, as the expert committee report did not raise any adverse comments.
Sarma said central projects worth around Rs 55,000 crore have been sanctioned for the state in the past one year. “The Centre had assured infrastructure projects worth Rs 80,000 crore during the second Advantage Assam investment summit last year, and the state has already received approval for different projects worth Rs 55,000 crore,” he said.
The CM also said the central govt will soon sanction the elevated corridor connecting the Guwahati airport with Jalukbari, via which the ring road will pass, at Rs 1,500 crore.
“The Centre is likely to approve a Rs 1,500 crore project in a day or two to construct an elevated corridor from Guwahati airport to Jalukbari, the entry point of the state capital. On the other hand, the Rs 14,000-crore project for four-laning of the national highway from Baihata Chariali to Tezpur is at last stages of approval. We hope for it very soon,” he added.
Additionally, he said various infrastructural works are ongoing at Gauhati Medical College and Hospital for Rs 2,200 crore and Assam Medical College and Hospital for Rs 600 crore.
The CM said another highway project is being planned from the semiconductor plant at Jagiroad in Morigaon district to the Bhutan border via Udalguri by building another bridge over the Brahmaputra. “This project is under active consideration of the Centre. These strategic assets will also be used by civilians,” he added.
The Cabinet Committee on Economic Affairs, chaired by the PM, on Friday approved the construction of India’s first 34-km-long twin-tube road-cum-rail tunnel underneath the Brahmaputra between Gohpur and Numaligarh at Rs 18,662 crore.
PM Modi is scheduled to visit Assam in March ahead of the assembly polls, which will be his fourth visit to the poll-bound state since Dec.
The high-speed corridor was announced by the Union cabinet in April last year. The project spans a length of 166.80km, with 144.80km in Meghalaya and 22km in Assam.
The proposed greenfield high-speed corridor will improve connectivity to Tripura, Mizoram, Manipur and the Barak Valley of Assam from the mainland and Guwahati, with reduced travel distances and time.
The CM said, “The PM will also lay the foundation for the Kamakhya ropeway project, which will connect the Kamakhya railway station with the temple.” He added that the govt has already floated the tender for the ropeway project and the process will be completed soon.
“After some people opposed the corridor, the Gauhati high court asked IIT Guwahati and the National Institute of Hydrology to study if the project would have any ecological impact. They said there would be no impact,” the CM said. Sarma said the work for the stalled Maa Kamakhya Temple Access Corridor project under the PM-DevINE scheme is likely to resume soon, as the expert committee report did not raise any adverse comments.
Sarma said central projects worth around Rs 55,000 crore have been sanctioned for the state in the past one year. “The Centre had assured infrastructure projects worth Rs 80,000 crore during the second Advantage Assam investment summit last year, and the state has already received approval for different projects worth Rs 55,000 crore,” he said.
The CM also said the central govt will soon sanction the elevated corridor connecting the Guwahati airport with Jalukbari, via which the ring road will pass, at Rs 1,500 crore.
“The Centre is likely to approve a Rs 1,500 crore project in a day or two to construct an elevated corridor from Guwahati airport to Jalukbari, the entry point of the state capital. On the other hand, the Rs 14,000-crore project for four-laning of the national highway from Baihata Chariali to Tezpur is at last stages of approval. We hope for it very soon,” he added.
Additionally, he said various infrastructural works are ongoing at Gauhati Medical College and Hospital for Rs 2,200 crore and Assam Medical College and Hospital for Rs 600 crore.
The CM said another highway project is being planned from the semiconductor plant at Jagiroad in Morigaon district to the Bhutan border via Udalguri by building another bridge over the Brahmaputra. “This project is under active consideration of the Centre. These strategic assets will also be used by civilians,” he added.
The Cabinet Committee on Economic Affairs, chaired by the PM, on Friday approved the construction of India’s first 34-km-long twin-tube road-cum-rail tunnel underneath the Brahmaputra between Gohpur and Numaligarh at Rs 18,662 crore.
Popular from City
- Blast, flames, screams and deaths: Bhubaneswar rooftop bomb blast kills man and his mother; video surfaces
- Mumbai couple back from Thailand cheated of 1,000 Thai Baht; driver demanded cash mid-ride, 2 held
- Addicted to online gambling, Bengaluru staffer at Indian Bank steals gold worth Rs 4 crore from customer lockers
- Pune collector sets 20-day deadline for highway exit & lane discipline SOPs
- Mumbai traffic restrictions on Feb 17 for India-France year of Innovation event- check full list
end of article
Trending Stories
- Jake Paul’s girlfriend Jutta Leerdam claims 500m silver in Milan after 1000m gold as Netherlands celebrates
- JEE Main 2026 Session 1 result released at nta.ac.in: Direct link to download here
- T20 WC: Sri Lanka beat Australia by 8 wickets to enter Super Eight
- 'Terrible mistake': Ashwin exposes Pakistan's big blunder vs India
- 'Gussa chodh do bhai': Suryakumar Yadav's message to Kuldeep Yadav goes viral - WATCH
- JEE Main Session 1 result 2026: 12 candidates secure a perfect 100 percentile, here’s the list
- T20 WC: Afghanistan beat UAE by 5 wickets to clinch first win
Featured in city
- Vaibhav Suryavanshi Opts Out: Rising Bihar star skips CBSE exams; cites cricket, security concerns
- Late-night drive, temple visit: Bengaluru car crash victims gave different reasons at home to step out
- Mumbai's Mulund concrete block collapse: MMRDA orders special intensive safety inspection across entire Metro 4 corridor
- Avoid 'young, attractive female' profiles: MHA SOP warns cops against Pakistani honeytraps
- Delhi skill push falters: 5 years after launch, seat closures and sharp drop in student intake
- Summer ready in Bengaluru? BWSSB lists 448 high-alert water-stressed zones; rolls out Rs 10 cr action plan
Photostories
- From Vada Pav to Pumpkin Chicken Curry: 10 comforting dishes that Sachin Tendulkar loves to eat
- 8 popular types of motorbikes and their uses
- 8 comforting steamed egg dishes to try from around the world
- 7 stunning colour-changing birds found around the world
- Before fame, THIS Bollywood comedian worked as a factory tailor, tragedy struck when his wife died minutes after childbirth
- 8 savoury snacks to make with Sattu in 20 minutes
- From Kapil Sharma to Bharti Singh, Ram Kapoor and more- TV celebs who surprised fans with their shocking weight loss transformation
- Raised by famous actors, THIS legendary actress was pushed into films at just 13 despite having no desire to act
- Top 7 tallest buildings from across the world
- Chennai's much-awaited L-shaped Madhya Kailash flyover opens for commuters
Videos
03:37 Farewell Address To Nation: Yunus Steps Down Before BNP Takes Charge In Dhaka28:48 Mega AI Summit In Delhi, 20 Heads Of State To Attend; Which Names Figure In New Epstein Files Dump?04:57 'From 25 Years To 5’ Rajnath Singh Pushes DRDO With 5-Year Ultimatum On 5th And 6th Gen Engines07:16 Indian Team To Visit US Next Week To Finalise Trade Deal Framework As Govt Faces Opposition Fire05:45 'AI Works On Data, Humans Create The Unseen': CBFC Chairman Prasoon Joshi At AI Impact Summit 202603:12 "Pierce Brosnan To Play Me?" Karti Chidambaram Jokes Amid Dhurandhar Buzz03:37 “India Must Move Fast In Ai Era”: Chief Economic Adviser Calls For Structural Reforms13:46 'AI Will Create More Than It Destroys': Microsoft India Chief Puneet Chandok Predicts 3-Year Rise03:52 Mother And Son Die After Rooftop Crude Bomb Making Goes Wrong, Explosion Rocks Bhubaneswar
Up Next
Start a Conversation
Post comment