Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

PWD’s Rs 10.5 Crore Push for a 47 km Integrated Transit Corridor: Three New Flyovers, Geotechnical Surveys, and Safety-Driven Designs Planned to Decongest West and Southwest Delhi

TNN | Last updated on - Oct 26, 2025, 13:29 IST
Comments
Share
1/10

Delhi’s major traffic overhaul initiative

The Public Works Department (PWD) has embarked on an ambitious plan to revamp traffic movement across the city, particularly targeting western and southwestern Delhi. This initiative follows recent announcements of over 10 projects aimed at streamlining traffic, improving commuting efficiency, and reducing congestion on some of the city’s busiest stretches. (AI Images)

2/10

Three flyovers to decongest West and Southwest Delhi:

As part of this plan, PWD has proposed constructing three major flyovers. These include the stretch from Kanjhawala Chowk to Mangolpuri, Keshopur depot to Haiderpur, and Sagarpur to Mayapuri Chowk. These flyovers are expected to become crucial arteries for easing traffic pressure in these densely populated areas. (AI Image)

3/10

Budget for consultancy and feasibility studies

Nearly Rs 10.5 crore has been allocated for consultancy services to conduct feasibility studies. These consultants will develop detailed design drawings, assess structural needs, and provide recommendations for underpasses, subways, elevated corridors, and foot overbridges (FOBs) where necessary. (AI Image)

4/10

Length and scale of proposed corridors

The three proposed flyovers vary significantly in length, reflecting their potential impact and geographic challenges. The Keshopur depot-Haiderpur stretch is the longest at 17.5 km, followed by 10.7 km between Kanjhawala Chowk and Mangolpuri, and 4.3 km from Sagarpur to Mayapuri Chowk. Each corridor is strategically planned to optimize traffic movement and reduce bottlenecks. (AI Image)

5/10

Integrated transit development plan

These projects are part of a larger 47 km transit corridor development initiative that includes flyovers, underpasses, elevated roads, and foot overbridges. The plan aims to integrate these stretches into a cohesive city-wide network, reducing traffic congestion and enhancing urban mobility. (AI Image)

6/10

Safety and technical considerations

The design phase will account for every technical detail, including pavement types at grade intersections, access points to adjacent plots, residential and commercial properties, lane configurations, and service roads. Comprehensive traffic safety features, signage, lane markings, overhead boards, crash barriers, and delineators will be incorporated to ensure user convenience and road safety. (AI Image)

7/10

Detailed traffic surveys across all modes

Consultants will carry out origin-destination surveys over three consecutive working days, covering 16 hours in both directions. These surveys will account for motorized vehicles, non-motorized vehicles, and pedestrian traffic, providing critical data on traffic composition, movement patterns, and peak-hour flows. (AI Image)

8/10

Geotechnical and sub-soil investigations

To ensure structural stability, consultants will perform geotechnical studies, including sub-soil exploration through trial pits and boreholes. This will determine soil properties, foundation safety, bearing capacity, and resilience against seismic disturbances and hydrostatic pressures, helping engineers decide the safest methods for constructing flyovers and underpasses. (AI Image)

9/10

Broad structural planning

The feasibility studies will also identify broad structural features, intersections, junctions, and service roads, ensuring smooth integration with Delhi’s existing transport grid. This comprehensive planning aims to minimize disruptions while improving connectivity across western and southwestern Delhi. (AI Image)

10/10

Other PWD projects across city

In addition to these three flyovers, PWD is working on several other projects, including a flyover along 100-Feet Road on SSN Marg in South Delhi, a 7 km stretch of Deshbandhu Gupta Road from Paharganj to Ajmeri Gate, a 4 km integrated corridor at ITO, and a 20 km corridor from Najafgarh to NH-48 near Kapashera. Together, these projects underline PWD’s city-wide commitment to modernizing traffic infrastructure and reducing congestion. (AI Image)

Top Comment
L
L R Bansal
211 days ago
The fly overs construction period may be 10 years from today by which time the traffic will multiply by two three times.
Read allPost comment
Photostories
  • Born on a Sunday? What it reveals about your personality, money, love and future
  • Ranveer Singh, Helena Bonham Carter, Johnny Depp: Actors' exits from films and web series that sparked controversy
  • 5 most beautiful rabbit breeds in the world you’ll instantly fall in love with
  • The problem-solver, the diplomat, the visionary: Which workplace personality are you?
  • Elon Musk quotes that reveal his mindset on innovation and risk
  • 7 powerful life lessons from Maya Angelou every woman should read
  • Children who feel heard at home usually grow up differently in these 7 ways
  • T. Rex vs Spinosaurus: Who was the true king of the dinosaurs?
  • From KitKat to Fish Scale: 7 luxury tile designs that instantly elevate modern home interiors
  • Heat waves are not just making you tired: They could be damaging your heart too, doctor warns
Explore more Stories
  • 7
    Back on track: Mumbai Monorail gears up for June restart, trial runs begin on Wadala stretch
  • 8
    Kolkata metro orange line finally connects Chingrighata 62-metre missing link
  • 8
    Bengaluru East station roars back to life after massive rail makeover
  • 10
    Slums beside Bandra station gone. Mumbai’s next big rail project starts here
  • 7
    Rs 20,000 crore, 16 stations: What’s in pipeline for Karnataka’s 1st inter-district metro
Up Next
  • News
  • /
  • City
  • /
  • Delhi
  • /
  • PWD’s Rs 10.5 Crore Push for a 47 km Integrated Transit Corridor: Three New Flyovers, Geotechnical Surveys, and Safety-Driven Designs Planned to Decongest West and Southwest Delhi
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 27, 2026, 12.42PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service