Trial run on Poonamallee-Porur metro line likely to start in March third week
CHENNAI: The trial run between Poonamallee CMRL depot and Porur Metro station is likely to begin in the third week of this month. As a precursor, a road cum rail vehicle (RRV), which is deployed to electrify the tracks, was operated from Poonamallee to Mullaithottam station on Saturday.
CMRL director (projects) T Archunan, along with other chief general managers, chief project managers, and contractors, inspected the track on a motor-trolley from Poonamallee depot to Mullaithottam station. The trolley was followed by the RRV.
The RRV is propelled by diesel and is deployed to lay overhead electrification work. "The fact that the RRV can run on the track is an indication that the track is ready to handle the actual coaches, which will begin in the third week of this month after the electrification work is done. The coaches have already arrived at Poonamallee depot," said director Archunan.
The 26.1km-long Corridor 4, connecting Poonamallee with Lighthouse at Marina Beach, is part of Phase II of the CMRL project, and work s is under way to begin operations on the stretch later this year.
Currently, the track-laying work on the 1.2 km stretch between Kumananchavadi and Karayanchavadi stations is almost complete, with just a few metres left to be covered.
"When the curing period for the concrete on the 1.2km stretch is over, the trial run can be extended up to Porur, likely from April. The trial run will be conducted at sharp curves, straight lines, and gradients," said the official.
After the highways planned a grade separator in Kattupakkam to ease traffic congestion, the initial design for Kumananchavadi and Karayanchavadi stations was altered, and the level of the stations was heightened to house the grade separator underneath, resulting in a delay of the metro rail work.
Stay updated with breaking news, weather updates, bank holidays and upcoming public holidays in march.
The RRV is propelled by diesel and is deployed to lay overhead electrification work. "The fact that the RRV can run on the track is an indication that the track is ready to handle the actual coaches, which will begin in the third week of this month after the electrification work is done. The coaches have already arrived at Poonamallee depot," said director Archunan.
The 26.1km-long Corridor 4, connecting Poonamallee with Lighthouse at Marina Beach, is part of Phase II of the CMRL project, and work s is under way to begin operations on the stretch later this year.
Currently, the track-laying work on the 1.2 km stretch between Kumananchavadi and Karayanchavadi stations is almost complete, with just a few metres left to be covered.
"When the curing period for the concrete on the 1.2km stretch is over, the trial run can be extended up to Porur, likely from April. The trial run will be conducted at sharp curves, straight lines, and gradients," said the official.
After the highways planned a grade separator in Kattupakkam to ease traffic congestion, the initial design for Kumananchavadi and Karayanchavadi stations was altered, and the level of the stations was heightened to house the grade separator underneath, resulting in a delay of the metro rail work.
Stay updated with breaking news, weather updates, bank holidays and upcoming public holidays in march.
Top Comment
raja suri
9 hours ago
Why should we wait for PM to open Pamban or any projects completed by Ministers inauguration. It gets delayed. After all it is our monies. Let the engineer do it. Read allPost comment
Popular from City
- ‘Thought it was the end’: Uttarakhand avalanche survivors recount ordeal
- Tangra like 'copycat suicide': Dad hangs self with autistic daughter at Kolkata flat
- During swearing-in, Bilaspur mayor vows to uphold ‘communalism’; watch
- 'She was upset': Techie held for reckless riding in Bengaluru with girlfriend on lap
- DKS warns stars for not attending film festival
end of article
Trending Stories
- “He is nothing but a traitor”: Wayne Gretzky’s wife’s post sparks controversy, igniting ongoing trolling from the Hockey community
- Tom Brady’s ex-wife Gisele Bündchen makes luxury purchase with boyfriend days after NFL legend sparks romance rumors with an old flame
- Who will Team India face in ICC Champions Trophy 2025 semi-final?
- WWE Elimination Chamber 2025 Result: Bianca Belair Wins the Women's Chamber Match
- Taylor Swift - Blake Lively drama gets a new spin as speculation rises that she’s leaning towards another star
- "If somebody’s son is good enough..." Cam Newton thinks Deion Sanders has done nothing wrong by giving his son the opportunity
- Chronology of Elon Musk’s children: A look at billionaire’s expanding family
Visual Stories
- How to make South Indian Paneer Butter Masala Dosa for breakfast
- 10 ancient animals that still exist
- 10 exotic animals to spot inside Kashmir's Dachigam National Park
- 10 powerful ways to detox and reset your mind
- 10 things parents should never do in the morning before sending kids to school
TOP TRENDS
UP NEXT