BANGALORE: To prevent waterlogging on Silk Board junction during rain, BBMP has planned to take up repair work by installing underground pipes.
As part of the project, it will install pipelines on Madivala Main Road towards Silk Board junction for one week. Result: traffic has been diverted in the area for the period.
All vehicles going towards BTM Layout 100 Ft ring road or HSR Layout 100 Ft ring road should take the flyover instead of taking the left-side road near Silk Board.
Once they are on the flyover, motorists have to take U-turn on both sides near Rupena Agrahara to go either towards BTM Layout or HSR Layout.